What's
Included in a Centennial
Log Home Package? |
- Rim Joists
- Steel or Wood Beams
- 2" x 8" CCA Sill Plate
- Steel or Treated Wood Columns
- Subfloor Glue
- 3/4" Tongue & Groove Plywood Subfloor
- Floor Joists (16" oc)
- All required logs are kiln dried.
- Spline
- Caulking for between Logs
- Prehung Exterior Doors
- Andersen®, 200 Series Tilt-Wash thermalbreak,
double pane insulated glass
- Window Buck Framing
- Log Gables
- Exterior Caulk
- Roof Framing Materials
- 1/2" CDX Plywood Roof Sheathing
- 15# UL Felt
- 30 Year 250# Architectural Simulated Shake Roof
Shingles
- 2" x 4" Interior Stud Walls
- All Exterior Trim and Fascia Materials
- 8"
Olylog® Screws
- All Porches included 2" x 6" Roof Rafters,
all Support Posts, Log Beams, Fascia, Roof Sheathing, Shingles,
and all necessary Nails.
- Treated Decking Materials where indicated
- 2" x 4" Firout for all Exterior Walls
- 1" x 6" Tongue & Groove for Interior
of all Exterior Walls
- 1/2" Dow Styrofoam ®
- Tyvek ® Housewrap
- Quality wood preservative
- 10 sets of Blueprints
- 300 Mile Free Delivery
- Locks for Exterior Doors
|
- Fiberglass Insulation for Exterior House Walls
- Custom Design & Engineering Services
- Interior 1" x 4" Baseboard Trim
- Door Buck Framing
- Window Screens
- Fireplace Framing Material
- Sill Sealer
- All Required Nails to complete the Shell
- Bird Blocks
- Shingle over Ridge Vent where indicated
- Exclusive R-30 Doublewall Log System
- Aluminum Louvers where indicated
- Step flashing
- Valley flashing
- Metal Roof Edge
- Skylites where indicated
- Log Ties
- 2x10 Exterior Headers
- Ridge Beam
- Subcontractor Bid Review
- Contracting Assistance
- Basement Stairs
- Fireblocking
- Joist Hangers
- Exterior Studwalls
- Upper Stairs
- Window Grids (front only)
- Shutters (front only)
- Garage Material where indicated
- Plywood Clips
- Interior Door & Window Trim
- Log Spindles and Porch Railing
- 2x10 Exterior Top Plates
- 10 Year Warranty
- Construction Manual
- R-30 Exterior Walls
- Up to Two Foot Overhang with Open Soffits
- Interior Window Trim
- 3" Log Spindles for Stairs to 2nd Floor
- 4" Rail for Stairs to 2nd Floor
|
| Items
not included in Kit are Construction labor, foundation, fireplaces,
heating, plumbing, electrical wiring, finish flooring, interior
doors, jambs and trim, cabinetry, interior wall finish, gutters
and other items not specifically mentioned. |
|